Project Overview
Highgrove Leisure Centre commissioned Pure Renewables to design, install and commission a renewable energy system which would achieve a minimum output temperature of 65°C and a peak thermal output (at 3°C) of 795 kWh. The project brief also required the team to remove and decommission the existing boiler plant before installing the new system.
The Solution
The dedicated project team completed the design stage and specified three Nova 440 heat pump units for the leisure centre. As with all units that Pure Renewables install, these use refrigerants which are natural and nontoxic with zero ozone depletion potential and very low global warming potential. Each unit would be crane lifted and positioned onto the roof and fitted with control systems for remote monitoring.
Key Installation Details
- Full RIBA Stage 3 & 4 for all M&E plus civils design.
- Buried pre-insulated mains connecting heat pumps with existing energy centre.
- Installation of new pipework systems throughout existing building.
- New electrical systems, including distribution boards.
- Expansion, pressurisation, and water treatment systems.
- Pumping and hydraulic separation equipment.
- Electrical system integrating and upgrading site wide infrastructure – working with DNO.
- Installation of bespoke buffer vessels.
- 24/7 metering and verification system.