Hillingdon Sports & Leisure Centre

Installation of a 2,000 kW air source heat pump – Hillingdon Sports & Leisure Centre

Project Overview

Pure Renewables were contracted to design a renewable energy solution across two sites at Hillingdon Sports and Leisure Centre, as part of London Borough and Hillingdon Council’s project to decarbonise council owned buildings. The project brief also required the team to remove and decommission the existing boiler plant before installing the new system.

The Solution

After completing extensive planning works and consultation with 3rd party stakeholders, a multi-product solution was designed, with a Solid Energy AWB252 heat pump being specified for the main facility and a Thermonova Nova 220 for the second site, the athletics facility. Each unit would be crane lifted and positioned onto the roof and fitted with control systems for remote monitoring. Due to the facility being in constant use, a flexible solution was required to segregate the works over four, out of hours, shut downs.

Key Installation Details

  • Full RIBA Stage 3 & 4 for all M&E plus civils design.
  • Installation of new pipework systems throughout existing building.
  • New electrical systems, including distribution boards.
  • Expansion, pressurisation, and water treatment systems.
  • Pumping and hydraulic separation equipment.
  • Electrical system integrating and upgrading site wide infrastructure – working with DNO.
  • Installation of bespoke buffer vessels.
  • 24/7 metering and verification system.